View history entry 2215 for Fabricated BB-Fab sn: BB-EE

Date: 2013-11-25
From: DWR Corn - Battery Bank
To: East End - Battery Bank
Title: Installed
Notes: This is the initial installation of this battery bank for the East End Tower. Four batteries were brought from the DWR Corn Construction tower and installed at this tower. The batteries are on a boardwalk on the ground next to the tower and will be moved to secondary scaffolding later.
Entered by: Joe Verfaillie