Equipment and Calibration History
View Equipment |
Date: |
2015-12-23 |
From: |
Twitchell Rice-Trailer - |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed with the temporary tower set up near the building at the rice project for the LGR COS experiment. This box had a significant amount of water inside. There was some corrosion on the power connectors but it looks like it was running up until I turned it off. I blew out all the connectors and stuffed it full of desiccant in the lab. |
Entered by: |
Joe Verfaillie |
|
|