Equipment and Calibration History
View Equipment |
Date: |
2013-12-19 |
From: |
Lab - none |
To: |
East End - PAR Sensor Incoming |
Title: |
Installed |
Notes: |
Reinstalled in the upward facing position after repairing the cable from being sheared off in the folding boom. |
Entered by: |
Joe Verfaillie |
|
|
Field notes