Equipment and Calibration History
View Equipment |
Date: |
2010-03-11 |
From: |
Lab - none |
To: |
Sherman Island - |
Title: |
Installed |
Notes: |
This pump was installed in the box at Sherman Island to run the LGR FMA there. The pump had 140 hours on it when it was installed. |
Entered by: |
|
|
|
Field notes