Equipment and Calibration History

View Equipment |

View history entry 156 for BOC Edwards GVSP30 sn: DG002

Date: 2010-03-11
From: Lab - none
To: Sherman Island -
Title: Installed
Notes: This pump was installed in the box at Sherman Island to run the LGR FMA there. The pump had 140 hours on it when it was installed.
Entered by:
Field notes