Equipment and Calibration History
View Equipment |
Date: |
2014-06-26 |
From: |
Lab - none |
To: |
Sherman Island - |
Title: |
Installed |
Notes: |
Installed with the Picarro / Forerunner soil raspiration campaign to control ventilation fans in the big box enclosure. |
Entered by: |
Joe Verfaillie |
|
|
Field notes