Equipment and Calibration History

History for Licor Quantum Q40955

Rec No.DateLoc FromTitleLoc ToNotes
7069 2024-12-18 Lab none Installed Rush Ranch PAR Sensor Incoming Installed on folding boom at Rush Ranch as part of the refurbished met system
6985 2024-10-24 Rush Ranch PAR Sensor Incoming Removed Lab none Removed from the main tower at Rush Ranch with the handoff of the site. To be cleaned up, tested and likely returned to the tower.