Equipment history at Bouldin Alfalfa| ALL | | Anemometer || Barometer || Camera || Data Logger || Flux Analyzer || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Range Finder || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Weather Station |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
Soil Moisture Probe | |||||
2016-08-12 | 17127 | CS655 | Installed | Soil Moisture Probe A | Installed with the initial set up of the site. |
2024-10-09 | 17127 | CS655 | Removed | Soil Moisture Probe A | Removed from BA tower and brought back to the lab. The BA field is getting plowed. |
2024-10-24 | 17127 | CS655 | Installed | Soil Moisture Probe A | Installed in the field after wheat was planted |
2016-08-12 | 17132 | CS655 | Installed | Soil Moisture Probe C | Installed with the initial set up of the site. |
2024-10-09 | 17132 | CS655 | Removed | Soil Moisture Probe C | Removed from BA tower and brought back to the lab. The BA field is getting plowed. This sensor got hit by the plow and one of its rods is sharply bent. |
2024-10-24 | 17132 | CS655 | Installed | Soil Moisture Probe C | Installed in the field after wheat was planted |
2016-08-12 | 17134 | CS655 | Installed | Soil Moisture Probe B | Installed with the initial set up of the site. |
2016-10-06 | 17134 | CS655 | Removed | Soil Moisture Probe B | Removed with soil sensor Set B from Bouldin Alfalfa. This set was hit by a mower. |
2016-11-22 | 17135 | CS655 | Installed | Soil Moisture Probe B | Installed at the Bouldin Alfalaf Tower to replace the on destroyed by the mower. It was buried horizontally at about 2.5cm depth. The data logger program was not updated for the new SDM address until 2016-12-21 |
2024-10-09 | 17135 | CS655 | Moved | Soil Moisture Probe B | BA tower was moved temporarily to the edge of the field by the ditch to make way for plowing/planting. This sensor was removed from the field and reinstalled under the temporary tower location. |
2024-10-24 | 17135 | CS655 | Moved | Soil Moisture Probe B | Moved from under the tower into the field after wheat was planted |
2016-08-12 | M003369 | ML3 | Installed | Soil Moisture Probe Theta | Installed with the initial set up of the site. |
2024-10-09 | M003369 | ML3 | Moved | Soil Moisture Probe Theta | BA tower was moved temporarily to the edge of the field by the ditch to make way for plowing/planting. This sensor was removed from the field and reinstalled under the temporary tower location. |
2024-10-24 | M003369 | ML3 | Moved | Soil Moisture Probe Theta | Moved from under the tower into the field after wheat was planted |