Equipment and Calibration

Equipment history at Sherman Island

| ALL | | Anemometer || Barometer || CO2 Probe || CO2 Transmitter || Data Logger || Gas Analyzer || Heat Flux Plate || Interface || LED sensor || Moisture Point || Multiplexer || Net Radiometer || PAR Sensor || Precipitation || Pump || RH & Temp || Scroll Pump || Soil Moisture Probe || Solar Controller || Water Level |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Scroll Pump
2009-08-25 983071037 ESDP30A Installed Installed at Sherman Island to replace the scroll pump that seized. This pump had 2591.9 hours on it when installed.
2010-03-11 983071037 ESDP30A Removed This pump was removed from the box at Sherman Island because of high pressure in the LGR FMA cell (>155Torr). The pump had 7322.2 hours on it when it was removed.
2010-03-11 DG002 GVSP30 Installed This pump was installed in the box at Sherman Island to run the LGR FMA there. The pump had 140 hours on it when it was installed.
2010-07-28 DG002 GVSP30 Removed This pump was removed from the Sherman Island LGR for maintenance. It has 3467 hours on it.
2010-09-21 DG002 GVSP30 Installed Installed in the box at Sherman Island replacing Frank's diaphragm pump. Sounds real smooth.
2013-04-05 DG002 GVSP30 Removed Removed from the box at Sherman. This pump has not been run in the field in a long time and probably needs a check up before it is run again.
2009-08-25 SV1864 ISP-500C Removed This pump was removed from the box at sherman Island after blowing the fuse in the LGR and probably seizing. Lots or soot in both the intake and outlet. It had 9604.5 hours on it when removed and a note saying it had a minor rebuild at 1994.7 hours, May 2008.
Export to BADM