Equipment and Calibration

Equipment history at Sherman Barn

| ALL | | Anemometer || Camera || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || RH & Temp || Soil Moisture Probe || Water Level |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Precipitation
2018-07-11 49187-109 TE525MM Installed Precipitation Installed at Sherman Barn on a T-post in the northwest corner of the cow fence. This is the initial set up of the site.
2018-10-18 49187-109 TE525MM Calibration Precipitation Got 94 of 100 tips - adjusted by a total of 3.5 turns CCW (screws were loose, so this total is suspicious; should have been a CW adjustment when all was said and done) 2018-10-18: Got 94 of 100 tips - adjusted by 0.5 turns CW. 2018-12-18: Got 117 of 100 tips - adjusted by 1 turn CCW, but screws feel very loose. 2019-01-03: Got 118 of 100 tips - adjusted by 3 turns CCW. (previous adjustment of 1 turn CCW did not seem to make a difference). 2019-01-24: Got 100 of 100 tips! No adjustments made.
2019-10-31 49187-109 TE525MM Calibration Precipitation After cleaning the tipping bucket we connected it to a CR23x and dripped 475ml of water through the bucket which should result in 100tips. We got 90 tips. We turned its set screws two full rotations CW.
2019-11-19 49187-109 TE525MM Tested Precipitation Plug tipping bucket into the calibration CR23x and dripped 475ml of water through the bucket which should result in 100tips. Got 104 tips and turned both set screws 1/2 turn CCW.
2020-07-09 49187-109 TE525MM Removed Precipitation Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
Export to BADM