Equipment and Calibration

Equipment history at East Pond

| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Conductivity Sensor || Data Logger || DO Sensor || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Water Level |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Multiplexer
2018-06-13 1164 AM16/32A Installed Multiplexer Met Installed at East Pond to replace one with worn out channels. This one came off the decommissioned TA site.
2020-01-30 1164 AM16/32A Moved Multiplexer Met Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.
2018-04-17 1429 AM16/32A Installed Multiplexer Met Installed at EP tower as part of initial site set up.
2018-05-03 1429 AM16/32A Notes Multiplexer Met This mux also has spikes/drops in some channels, so starting to move sensors around to avoid spikes.
2018-06-13 1429 AM16/32A Removed Multiplexer Met Removed from East Pond due to spikes on worn out channels
2018-04-17 2856 AM25T Installed Multiplexer Thermocouple Installed at EP tower as part of initial site set up.
2020-01-30 2856 AM25T Moved Multiplexer Thermocouple Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.