Equipment and Calibration

Equipment history at East End

| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Conductivity Sensor || Data Logger || DO Sensor || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || RH & Temp || Solar Controller || Solar Panel || Spectrometer || Water Level |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Multiplexer
2013-11-25 11663 AM16/32B Moved Multiplexer Met The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland
2015-01-05 11663 AM16/32B Removed Multiplexer Met Removed from the site due to the tower falling over in the wind on 2014-12-30. Likely undamaged.
2015-01-20 11663 AM16/32B Installed Data Logger Met Reinstalled after being removed when the scaffolding fell over.
2013-11-25 6769 AM25T Moved Multiplexer Thermocouples The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland
2015-01-05 6769 AM25T Removed Multiplexer Thermocouples Removed from the site due to the tower falling over in the wind on 2014-12-30. Likely undamaged.
2015-01-20 6769 AM25T Installed Multiplexer Thermocouples Reinstalled after being removed when the scaffolding fell over.
Export to BADM