Equipment and Calibration

Equipment history at Hill Slough

| ALL | | Anemometer || Battery Bank || Camera || CO2 Probe || Conductivity Sensor || Data Logger || DO Sensor || Fluorometer || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || pH ORP || Precipitation || Range Finder || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Water Level || Wiper |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Fluorometer
2022-07-13 22E100649 EXO fDOM Installed fDOM Channel Installed as part of the EXO2 sonde at HS in the channel off of the boardwalk, about 30m east of the tower.
2022-09-16 22E100649 EXO fDOM Removed fDOM Channel Removed as part of the EXO2 channel deployed in the channel at HS. Brought back to the lab for cleaning and calibration.
2022-09-29 22E100649 EXO fDOM Installed fDOM Channel Installed as part of the EXO2 sonde in the channel at Hill Slough.
2023-01-03 22E100649 EXO fDOM Removed fDOM Removed from Hill Slough channel and brought back to the lab for calibration.
2023-01-06 22E100649 EXO fDOM Installed fDOM Installed in the channel at Hill Slough (same height as before) after calibrating in the lab yesterday.
2023-04-25 22E100649 EXO fDOM Removed fDOM Removed from HS channel for routine calibration
2023-05-09 22E100649 EXO fDOM Installed fDOM Installed in the channel at Hill Slough (same height as before) after calibration
2023-08-24 22E100649 EXO fDOM Installed fDOM Reinstalled after quarterly cleaning and calibration
2023-10-11 22E100649 EXO fDOM Removed fDOM Removed for inspection in the lab because turbidy/fDOM/ph/ORP look weird
2023-10-18 22E100649 EXO fDOM Installed fDOM Installed in the Hill Slough channel after calibration in the lab. The whole sonde was raised about 20cm to keep it out of the mud.
2024-01-18 22E100649 EXO fDOM Removed fDOM Removed from HS channel and brought back to the lab for routine calibration
2024-01-25 22E100649 EXO fDOM Installed fDOM Installed in the Hill Slough channel after calibration
2024-04-04 22E100649 EXO fDOM Removed fDOM Removed from the Hill Slough channel and brought back to the lab for calibration (and to install the new auto wiper that arrived)
2024-04-10 22E100649 EXO fDOM Installed fDOM Reinstalled at the HS channel after regular lab cleaning and calibration
2024-07-16 22E100649 EXO fDOM Removed fDOM Removed from the HS channel and brought back to the lab for routine calibration
2022-07-13 22E106072 EXO Turbidity Installed Turbidity Channel Installed as part of the EXO2 sonde at HS in the channel off of the boardwalk, about 30m east of the tower.
2022-09-16 22E106072 EXO Turbidity Removed Turbidity Channel Removed as part of the EXO2 sonde deployed in the channel at HS. Brought back to the lab for cleaning and calibration.
2022-09-29 22E106072 EXO Turbidity Installed Turbidity Channel Installed as part of the EXO2 sonde in the channel at Hill Slough.
2023-01-03 22E106072 EXO Turbidity Removed Turbidity Removed from Hill Slough channel and brought back to the lab for calibration.
2023-01-06 22E106072 EXO Turbidity Installed Turbidity Installed in the channel at Hill Slough (same height as before) after calibrating in the lab yesterday.
2023-04-25 22E106072 EXO Turbidity Removed Turbidity Removed from HS channel for routine calibration
2023-05-09 22E106072 EXO Turbidity Installed Turbidity Installed in the channel at Hill Slough (same height as before) after calibration
2023-08-24 22E106072 EXO Turbidity Installed Turbidity Reinstalled after quarterly cleaning and calibration
2023-10-11 22E106072 EXO Turbidity Removed Turbidity Removed for inspection in the lab because turbidy/fDOM/ph/ORP look weird
2023-10-18 22E106072 EXO Turbidity Installed Turbidity Installed in the Hill Slough channel after calibration in the lab. The whole sonde was raised about 20cm to keep it out of the mud.
2024-01-18 22E106072 EXO Turbidity Removed Turbidity Removed from HS channel and brought back to the lab for routine calibration
2024-01-25 22E106072 EXO Turbidity Installed Turbidity Installed in the Hill Slough channel after calibration
2024-04-04 22E106072 EXO Turbidity Removed Turbidity Removed from the Hill Slough channel and brought back to the lab for calibration (and to install the new auto wiper that arrived)
2024-04-10 22E106072 EXO Turbidity Installed Turbidity Reinstalled at the HS channel after regular lab cleaning and calibration
2024-07-16 22E106072 EXO Turbidity Removed Turbidity Removed from the HS channel and brought back to the lab for routine calibration
2024-07-23 22E106072 EXO Turbidity Installed Turbidity Installed in the Hill Slough channel after calibration. Sonde is in the air during low tide.
2024-10-17 22E106072 EXO Turbidity Removed Turbidity Removed from the Hill Slough channel and brought back to the lab for routine calibration
2024-10-24 22E106072 EXO Turbidity Installed Turbidity Installed in the HS channel after calibration
2024-07-23 24F104438 EXO fDOM Installed fDOM Installed in the Hill Slough channel after calibration. Sonde is in the air during low tide.
2024-10-17 24F104438 EXO fDOM Removed fDOM Removed from the Hill Slough channel and brought back to the lab for routine calibration
2024-10-24 24F104438 EXO fDOM Installed fDOM Installed in the HS channel after calibration
Export to BADM