Equipment history at Bouldin Corn| ALL | | Air Quality Sensor || Anemometer || Barometer || Camera || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Range Finder || RH & Temp || Soil Moisture Probe || Solar Controller || Water Level || Weather Station |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
Data Logger | |||||
2021-06-16 | 1132 | CR1000X | Installed | Data Logger Surface Renewal | Installed as part of Kevin Tu's surface renewal experiment |
2024-01-04 | 1132 | CR1000X | Removed | Data Logger Surface Renewal | Removed from BC at the conclusion of Corteva's IRT experiment. |
2021-06-09 | 23865 | CR1000 | Moved | none | Moved from BC to HS as part of rad cal kit |
2017-07-14 | 31308 | CR10X | Installed | Data Logger Diffuse PAR | Installed to do the high frequency measurements for diffuse PAR and report the CR1000 met data logger. |
2017-07-26 | 31308 | CR10X | Location | Data Logger Diffuse PAR | Check the serial number of the data logger at the site. |
2019-12-02 | 31308 | CR10X | Removed | Data Logger Diffuse PAR | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
2019-12-13 | 31308 | CR10X | Installed | Data Logger Diffuse PAR | Re-installed at Bouldin Corn after re-assembling tower. |
2017-04-26 | 66251 | CR1000 | Installed | Data Logger Met | Installed on the Bouldin Corn Tower to collect the met data with the initial set up of the site. |
2019-12-02 | 66251 | CR1000 | Removed | Data Logger Met | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
2019-12-13 | 66251 | CR1000 | Installed | Data Logger Met | Re-installed at Bouldin Corn after re-assembling tower. |