Equipment and Calibration
Equipment history at Vaira| ALL | | Anemometer || Battery Bank || Camera || CO2 Probe || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Interface || LED sensor || Moisture Point || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Pyranometer || Radio || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Weather Station |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
CO2 Probe | |||||
2012-03-21 | G0230061 | GMT222 | Installed | CO2 probe North Profile -0.02 | Installed at Vaira in the north set at -2cm |
2014-01-24 | G0230061 | GMT222 | Removed | CO2 probe North Profile -0.02 | Removed from Vaira north plot at -2cm for lab calibration |
2014-01-29 | G0230061 | GMT222 | Installed | CO2 probe North Profile -0.02 | Installed at Vaira in the North profile as -2cm with new U-shaped tops on the PVC enclosures. |
2014-04-22 | G0230061 | GMT222 | Moved | CO2 probe North Profile -0.04 | At Vaira North profile, moved from -2cm to -4cm. |
2014-12-09 | G0230061 | GMT222 | Location | CO2 probe North Profile -0.04 | Vaira North profile at -4cm - may have been at -2cm |
2015-11-03 | G0230061 | GMT222 | Removed | CO2 probe North Profile -0.04 | Removed from Vaira North profile at -4cm due to bad readings. Replaced by sn L2010068 |
2012-03-21 | G0230062 | GMT222 | Installed | CO2 probe West Profile -0.02 | Installed at Vaira in the west set at -2cm |
2014-01-24 | G0230062 | GMT222 | Removed | CO2 probe West Profile -0.02 | Removed from Vaira west plot at -2cm for lab calibration |
2014-01-29 | G0230062 | GMT222 | Installed | CO2 probe West Profile -0.02 | West profile as -2cm with new U-shaped tops on the PVC enclosures. |
2014-03-18 | G0230062 | GMT222 | Moved | CO2 probe West Profile -0.04 | At Vaira in the West profile this probe was moved from the -2cm location to -4cm |
2014-04-22 | G0230062 | GMT222 | Removed | CO2 probe West Profile -0.08 | Removed from Vaira West profile at -8cm, replaced by sn K1350101 |
2014-12-09 | G0230062 | GMT222 | Location | CO2 probe North Profile -0.02 | Vaira North profile at -2cm - may have been at -8cm |
2016-02-04 | G0230062 | GMT222 | Removed | CO2 probe North Profile -0.02 | Removed from Vaira North profile at -2cm for calibration |
2016-02-23 | G0230062 | GMT222 | Installed | CO2 probe North Profile -0.02 | Installed in the Vaira North profile at -2cm after lab calibration. |
2017-08-25 | G0230062 | GMT222 | Removed | CO2 probe North Profile -0.02 | Removed from Vaira from North profile -2 cm position for calibration |
2017-09-14 | G0230062 | GMT222 | Installed | CO2 probe North Profile -0.02 | Reinstalled at Vaira in the North profile at -2cm after lab calibration. |
2017-09-21 | G0230062 | GMT222 | Moved | CO2 probe North Profile -0.16 | Moved from North profile at -2cm to North profile at -16cm |
2020-12-01 | G0230062 | GMT222 | Removed | CO2 probe North Profile -0.16 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2017-09-21 | GP20160012 | GP-001 | Installed | CO2 probe West Profile -0.16 | Installed in the Vaira West profile at -16cm |
2022-05-10 | GP20160012 | GP-001 | Removed | CO2 probe West Profile -0.16 | Removed with the last of the soil co2 system because data not good and to reduce power load. |
2017-09-21 | GP20160042 | GP-001 | Installed | CO2 probe West Profile -0.02 | Installed in the Vaira West profile at -2cm |
2022-05-10 | GP20160042 | GP-001 | Removed | CO2 probe West Profile -0.02 | Removed with the last of the soil co2 system because data not good and to reduce power load. |
2017-09-21 | GP20160117 | GP-001 | Installed | CO2 probe West Profile -0.08 | Installed in the Vaira West profile at -8cm |
2022-05-10 | GP20160117 | GP-001 | Removed | CO2 probe West Profile -0.08 | Removed with the last of the soil co2 system because data not good and to reduce power load. |
2017-09-21 | GP20170028 | GP-001 | Installed | CO2 probe West Profile -0.04 | Installed in the Vaira West profile at -4cm |
2022-05-10 | GP20170028 | GP-001 | Removed | CO2 probe West Profile -0.04 | Removed with the last of the soil co2 system because data not good and to reduce power load. |
2014-04-22 | K1310102 | GMP222 | Installed | CO2 probe West Profile -0.04 | Installed in the Varia West profile at -4cm replacing sn Y1720006 |
2017-10-05 | K1310102 | GMP222 | Installed | CO2 probe East Profile -0.04 | Installed at Vaira in the East profile at the -4cm location |
2017-11-29 | K1310102 | GMP222 | Removed | CO2 probe East Profile -0.04 | Removed from the 4cm location in the East profile at Vaira. This probe was giving erratic values |
2014-04-22 | K1310103 | GMP222 | Installed | CO2 probe West Profile -0.02 | Installed in the Varia West profile at -2cm replacing sn Y0850004 |
2016-02-23 | K1310103 | GMP222 | Installed | CO2 probe East Profile -0.04 | Installed in the Vaira East profile at -4cm after lab calibration. |
2017-08-25 | K1310103 | GMP222 | Removed | CO2 probe East Profile -0.04 | Removed from Vaira from East profile -4 cm position for calibration |
2017-09-14 | K1310103 | GMP222 | Installed | CO2 probe East Profile -0.04 | Reinstalled at Vaira in the North profile at -4cm after lab calibration. |
2017-09-21 | K1310103 | GMP222 | Moved | CO2 probe East Profile -0.02 | Moved from North profile at -4cm to East profile at -2cm |
2020-12-01 | K1310103 | GMP222 | Removed | CO2 probe East Profile -0.02 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2014-04-22 | K1350101 | GMP222 | Installed | CO2 probe West Profile -0.02 | Installed in the Varia West profile at -2cm replacing sn G0230062 |
2014-12-09 | K1350101 | GMP222 | Location | CO2 probe West Profile -0.08 | Vaira West profile at -8cm |
2016-02-04 | K1350101 | GMP222 | Removed | CO2 probe West Profile -0.08 | Removed from Vaira West profile at -8cm for calibration |
2016-02-23 | K1350101 | GMP222 | Installed | CO2 probe West Profile -0.08 | Installed in the Vaira West profile at -8cm after lab calibration. |
2017-08-25 | K1350101 | GMP222 | Removed | CO2 probe West Profile -0.08 | Removed from Vaira from West profile -8 cm position for calibration |
2017-10-05 | K1350101 | GMP222 | Installed | CO2 probe North Profile -0.04 | Installed at Vaira in the North profile at the -4cm location |
2020-12-01 | K1350101 | GMP222 | Removed | CO2 probe North Profile -0.04 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2014-12-09 | K1350102 | GMP222 | Location | CO2 probe West Profile -0.04 | Vaira West profile at -4cm |
2016-02-04 | K1350102 | GMP222 | Removed | CO2 probe West Profile -0.04 | Removed from Vaira West profile at -4cm for calibration |
2016-02-23 | K1350102 | GMP222 | Installed | CO2 probe West Profile -0.04 | Installed in the Vaira West profile at -4cm after lab calibration. |
2017-08-25 | K1350102 | GMP222 | Removed | CO2 probe West Profile -0.04 | Removed from Vaira from West profile -4 cm position for calibration |
2017-09-14 | K1350102 | GMP222 | Installed | CO2 probe East Profile -0.04 | Reinstalled at Vaira in the East profile at -4cm after lab calibration. |
2017-09-21 | K1350102 | GMP222 | Moved | CO2 probe East Profile -0.16 | Moved from East profile at -4cm to East profile at -16cm |
2020-12-01 | K1350102 | GMP222 | Removed | CO2 probe East Profile -0.16 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2014-12-09 | K1350103 | GMP222 | Location | CO2 probe West Profile -0.02 | Vaira West profile at -2cm |
2016-02-04 | K1350103 | GMP222 | Removed | CO2 probe West Profile -0.02 | Removed from Vaira West profile at -2cm for calibration |
2016-02-23 | K1350103 | GMP222 | Installed | CO2 probe West Profile -0.02 | Installed in the Vaira West profile at -2cm after lab calibration. |
2017-08-25 | K1350103 | GMP222 | Removed | CO2 probe West Profile -0.02 | Removed from Vaira from West profile -2 cm position for calibration |
2017-11-29 | L2010067 | GMM222 | Installed | CO2 probe East Profile -0.04 | Installed in the 4cm location in the East profile at Vaira to replace a probe with erratic values. |
2020-12-01 | L2010067 | GMM222 | Removed | CO2 probe East Profile -0.04 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2015-11-03 | L2010068 | GMM222 | Installed | CO2 probe North Profile -0.04 | Installed in Vaira North profile at -4cm to replace sn G0230061 |
2016-02-04 | L2010068 | GMM222 | Removed | CO2 probe North Profile -0.04 | Removed from Vaira North profile at -4cm for calibration |
2016-02-23 | L2010068 | GMM222 | Installed | CO2 probe North Profile -0.04 | Installed in the Vaira North profile at -4cm after lab calibration. |
2017-08-25 | L2010068 | GMM222 | Removed | CO2 probe North Profile -0.04 | Removed from Vaira from North profile -4 cm position for calibration |
2015-11-03 | L2010070 | GMM222 | Installed | CO2 probe North Profile -0.04 | Installed in Vaira North profile at -4cm to replace sn Y1950005 |
2016-02-04 | L2010070 | GMM222 | Removed | CO2 probe North Profile -0.08 | Removed from Vaira North profile at -8cm for calibration |
2016-02-23 | L2010070 | GMM222 | Installed | CO2 probe North Profile -0.08 | Installed in the Vaira North profile at -8cm after lab calibration. |
2017-08-25 | L2010070 | GMM222 | Removed | CO2 probe North Profile -0.08 | Removed from Vaira North profile, -8 position and brought back to the lab for calibration |
2017-09-14 | L2010070 | GMM222 | Installed | CO2 probe North Profile -0.08 | Reinstalled at Vaira in the North profile at -8cm after lab calibration. |
2017-09-21 | L2010070 | GMM222 | Location | CO2 probe North Profile -0.08 | This probe did not change location |
2020-12-01 | L2010070 | GMM222 | Removed | CO2 probe North Profile -0.08 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2012-03-21 | Y0710013 | GMP221 | Installed | CO2 probe North Profile -0.08 | Installed at Vaira in the north set at -8cm |
2014-01-24 | Y0710013 | GMP221 | Removed | CO2 probe North Profile -0.08 | Removed from Vaira north plot at -8cm for lab calibration |
2014-01-29 | Y0710013 | GMP221 | Installed | CO2 probe North Profile -0.08 | Installed at Vaira in the North profile as -8cm with new U-shaped tops on the PVC enclosures. |
2014-04-22 | Y0710013 | GMP221 | Removed | CO2 probe North Profile -0.08 | Removed from Vaira North profile at -8cm |
2012-03-21 | Y0850004 | GMP221 | Installed | CO2 probe West Profile -0.04 | Installed at Vaira in the west set at -4cm |
2014-01-24 | Y0850004 | GMP221 | Removed | CO2 probe West Profile -0.04 | Removed from Vaira west plot at -4cm for lab calibration |
2014-01-29 | Y0850004 | GMP221 | Installed | CO2 probe West Profile -0.04 | West profile as -4cm with new U-shaped tops on the PVC enclosures. |
2014-03-18 | Y0850004 | GMP221 | Moved | CO2 probe West Profile -0.08 | At Vaira in the West profile this probe was moved from the -4cm location to -8cm |
2014-04-22 | Y0850004 | GMP221 | Removed | CO2 probe West Profile -0.02 | Removed from Vaira West profile at -2cm, replaced by sn K1310103 |
2012-03-21 | Y1720006 | GMP221 | Installed | CO2 probe West Profile -0.08 | Installed at Vaira in the west set at -8cm |
2014-01-24 | Y1720006 | GMP221 | Removed | CO2 probe West Profile -0.08 | Removed from Vaira west plot at -8cm for lab calibration |
2014-01-29 | Y1720006 | GMP221 | Installed | CO2 probe West Profile -0.08 | West profile as -8cm with new U-shaped tops on the PVC enclosures. |
2014-03-18 | Y1720006 | GMP221 | Moved | CO2 probe West Profile -0.02 | At Vaira in the West profile this probe was moved from the -8cm location to -2cm |
2014-04-22 | Y1720006 | GMP221 | Removed | 0 | Removed from Vaira West profile at -4cm, replaced by sn K1310102 |
2012-03-21 | Y1950005 | GMP222 | Installed | CO2 probe North Profile -0.04 | Installed at Vaira in the north set at -4cm |
2014-01-24 | Y1950005 | GMP222 | Removed | CO2 probe North Profile -0.04 | Removed from Vaira north plot at -4cm for lab calibration |
2014-01-29 | Y1950005 | GMP222 | Installed | CO2 probe North Profile -0.04 | Installed at Vaira in the North profile as -4cm with new U-shaped tops on the PVC enclosures. |
2014-04-22 | Y1950005 | GMP222 | Moved | CO2 probe North Profile -0.08 | At Vaira North profile, moved from -4cm to -8cm. |
2014-12-09 | Y1950005 | GMP222 | Location | CO2 probe North Profile -0.08 | Vaira North profile at -8cm - may have been at -4cm |
2015-11-03 | Y1950005 | GMP222 | Removed | CO2 probe North Profile -0.08 | Removed from Vaira North profile at -8cm due to bad readings. Replaced by sn L2010070 |
2012-03-21 | Y2009100 | GMP221 | Installed | CO2 probe East Profile -0.08 | Installed at Vaira in the east set at -8cm |
2014-01-24 | Y2009100 | GMP221 | Removed | CO2 probe East Profile -0.08 | Removed from Vaira east plot at -8cm for lab calibration |
2014-01-29 | Y2009100 | GMP221 | Installed | CO2 probe East Profile -0.08 | East profile as -8cm with new U-shaped tops on the PVC enclosures. |
2014-03-18 | Y2009100 | GMP221 | Removed | CO2 probe East Profile -0.08 | Removed from Vaira in the East profile due to malfunction. |
2014-12-09 | Y2009109 | GMP222 | Location | CO2 probe East Profile -0.08 | Vaira East profile at -8cm |
2016-02-23 | Y2009109 | GMP222 | Installed | CO2 probe East Profile -0.02 | Installed in the Vaira East profile at -2cm after lab calibration. |
2017-08-25 | Y2009109 | GMP222 | Removed | CO2 probe East Profile -0.02 | Removed from Vaira from East profile -2 cm position for calibration. Probe labeled 4. |
2017-09-14 | Y2009109 | GMP222 | Installed | CO2 probe East Profile -0.02 | Reinstalled at Vaira in the East profile at -2cm after lab calibration. |
2017-09-21 | Y2009109 | GMP222 | Moved | CO2 probe East Profile -0.08 | Moved from East profile at -2cm to East profile at -8cm |
2020-12-01 | Y2009109 | GMP222 | Removed | CO2 probe East Profile -0.08 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2012-03-21 | Y2030049 | GMP222 | Installed | CO2 probe East Profile -0.02 | Installed at Vaira in the east set at -2cm |
2014-01-24 | Y2030049 | GMP222 | Removed | CO2 probe East Profile -0.02 | Removed from Vaira east plot at -2cm for lab calibration |
2014-01-29 | Y2030049 | GMP222 | Installed | CO2 probe East Profile -0.02 | Installed at Vaira in the East profile as -2cm with new U-shaped tops on the PVC enclosures. |
2014-12-09 | Y2030049 | GMP222 | Location | CO2 probe East Profile -0.04 | Vaira East profile at -4cm |
2016-02-23 | Y2030049 | GMP222 | Installed | CO2 probe East Profile -0.08 | Installed in the Vaira East profile at -8cm after lab calibration. Using a new cable. |
2017-08-25 | Y2030049 | GMP222 | Removed | CO2 probe East Profile -0.08 | Removed from Vaira from East profile -8 cm position for calibration |
2017-09-14 | Y2030049 | GMP222 | Installed | CO2 probe East Profile -0.08 | Reinstalled at Vaira in the East profile at -8cm after lab calibration. |
2017-09-21 | Y2030049 | GMP222 | Moved | CO2 probe North Profile -0.02 | Moved from East profile at -8cm to North profile at -2cm |
2020-12-01 | Y2030049 | GMP222 | Removed | CO2 probe North Profile -0.02 | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
2012-03-21 | Z2720015 | GMP222 | Installed | CO2 probe East Profile -0.04 | Installed at Vaira in the east set at -4cm |
2014-01-24 | Z2720015 | GMP222 | Removed | CO2 probe East Profile -0.04 | Removed from Vaira east plot at -4cm for lab calibration |
2014-01-29 | Z2720015 | GMP222 | Installed | CO2 probe East Profile -0.04 | East profile as -4cm with new U-shaped tops on the PVC enclosures. |
2014-12-09 | Z2720015 | GMP222 | Location | CO2 probe East Profile -0.02 | Vaira East profile at -2cm |
2016-02-04 | Z2720015 | GMP222 | Removed | CO2 probe East Profile -0.04 | Removed from Vaira East profile at -4cm for calibration |