Equipment and Calibration History
History for Campbell Sci. AM25T 7908
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
4301 | 2019-12-13 | Lab none | Installed | Bouldin Corn Multiplexer Thermocouple | Re-installed at Bouldin Corn after re-assembling tower. |
4269 | 2019-12-02 | Bouldin Corn Multiplexer Thermocouple | Removed | Lab none | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
2734 | 2017-04-26 | Lab none | Installed | Bouldin Corn Multiplexer Thermocouple | Installed at the Bouldin Corn site with the initial set up of the tower. |