Equipment and Calibration History
History for Campbell Sci. CR10X 12213
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
1621 | 2014-10-09 | Mayberry-Portable | Removed | Lab none | Removed with the rest of the portable tower equipment. End of the portable tower campaign. |
1610 | 2013-01-06 | Tonzi | Removed | Lab none | Removed from the non-functional east sap flow station at Tonzi. |