Equipment and Calibration History

History for Handar 425A 0846

Rec No.DateLoc FromTitleLoc ToNotes
7029 2024-11-13 Lab none For Resuse Lab none Marked for reuse
2134 2015-12-23 Tonzi Removed Lab none Removed from the top location of the wind profile near the Floor tower.
1768 2015-04-08 Lab none Installed Tonzi Installed at 7.56m agl in a wind profile near the Floor tower.
489 2011-12-23 Lab none Tested Lab none Tested with other Handar sonics by placing each sonic at 17cm, 48cm, 78cm and 108cm from a blower. All sonics gave similar resonable readings.
475 2008-12-11 Tonzi-Tower Removed Lab none Removed with the Tonzi Tower wind profile.
470 2003-08-01 Lab none Installed Tonzi-Tower Installed on the Tonzi Tower as part of a wind profiles with sonics at 10.61m, 11.76m, 13.21m, 15.04m and 16.86m.